Tread types concrete pan smooth plate diamond tread precast open riser precast closed riser bar grating pg 1 1 pg 1 2 pg 1 3 pg 1 4 handrail type pipe 1.
Tibe stell mounted to top of cmu wall.
You ll also need a 3 4 x 24 in.
Ties masonry to masonry for structural load bearing non structural intersecting cmu walls.
Attaching the railing to a concrete base.
Water pipe which serves as the handle and screws into the bender head photo 5.
They can be used in concrete block and brick.
Base of wall detail anchored brick veneer cmu backing cmu foundation 01 030 0402.
Electric conduit bender photo 5 is the only specialty tool you need to bend 10 ft.
Of course all generic details must be modified to the specifics of your project and approved by an architect or engineer prior to use for construction.
A variety of example details are available here ranging from customizable details to illustrative examples addressing many situations for concrete masonry structures.
Product data sheet sds hot dip leed purchase online.
Spaced 2 apart tie to horizontal.
Then you attach an accessory called an ez bracket to the top and the bottom of the steel post.
Window sill detail anchored brick veneer cmu backing 01 030 0501.
Both hex head and phillips head styles are available.
To attach your railing to concrete you will need a hammer drill to drill into the concrete a standard drill for drilling into the pipe an allen wrench to tighten the fittings a hammer a tape measure hack saw vacuum extension cord and a sharpie marker.
From top of wall 6 pvc pipe filled with concrete or fiberglass post insulator attached to post notes 1.
Along with that you need basic hand tools a hacksaw and a drill with a 1 4 in.
Aisc hss pipe round 1 1 4 schd 40 2x2x3 16 1 1 2 schd 40 top rail posts kneerail max riser stringer type flat plate 1 4 3 8 channel types mc12x10 6 c12x20 7 12 typ.
There are three different ways to install a vinyl fence on top of a wall.
You don t drop the entire 4 x4 or 5 x5 post into the wall with this method.
This is the most sturdy method.
Franklin road meridian id 83642 5902 phone.
Unsupported brick return at jamb.
All steel will have 1 1 2 of concrete cover.
You take a 2 steel post and sink it into the wall.
Attach plastic pin lock insulators to post with anchors and screws.