Seat the end tongue and groove flooring into each other and push the two boards together for a tight seam.
Tongue and groove flooring installation.
Installing floating tongue and groove flooring can provide you with a beautiful floor in any area of the house.
How to install tongue and groove flooring.
Nail the floor every 2 ft.
Start at one end of the board and work to the other nailing every 2 ft.
Begin the first row of flooring by placing the planks with the tongue side facing the wall.
Step 2 spread adhesive.
You don t need a truck load of tools to do a good job installing them and once you get the hang of it you can work like a pro.
Countersink all the nails.
Install the second plank next to the first by aligning the tongue into the groove and press the plank down to snap it in place.
Installing tongue and groove floors engineered pre finished or bare wood is among the most popular diy projects and for good reason.
Undercutting saw only needed if removing carpet seam tape.
Similar to the above instructions you need to apply wood adhesive along your wood s grooved edges.
Although tongue and groove solid hardwood flooring does fit together it must still be nailed to a subfloor.
After the first row tap each subsequent row into place and nail with a flooring stapler.
Drive 6d or 8d flooring nails through the pilot holes and then drill additional pilot holes through the tongue at a 45 degree angle spaced as directed by the manufacturer.
Gluing the tongue and groove flooring to concrete is pretty similar to a floating floor but there are minor differences.
Step 1 glue the joints.
From the wall measure one board width and snap a chalk line.
When you come to the end of the first row cut the length of plank needed to complete the row.
Lock the boards into place then face nail the first row of boards then use a pneumatic flooring nailer to nail each nail into the tongue of the board.
If you re installing tongue and groove boards over drywall or plaster especially it s a good idea to install 1x2 battens and fasten them directly to the framing with 2 1 2 in.
Engineered tongue and groove planks however snap together to create a floating floor.
Using a floating installation will also allow you to easily install the job yourself.
Insert shims for even gaps and nail through the tongue of the board with a flooring stapler.
Glueing to concrete floor.